Update - The contractor identified additional parts that are needed for the repair work. Therefore, maintenance on this elevator is still in progress.
Jun 30, 2025 - 09:10 EDT
Update - Technicians from our designated contractor are currently working on repairs. We will provide updates as soon as we have more information. Thank you for your patience and understanding.
Jun 23, 2025 - 09:13 EDT
Update - Awaiting the arrival of necessary parts for repair work. Thank you for your patience and understanding during this time.
Jun 03, 2025 - 08:02 EDT
Update - Scheduled maintenance is still in progress. We will provide updates as necessary.
May 21, 2025 - 09:25 EDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Apr 26, 2025 - 17:05 EDT
Scheduled - Our team is still continuing to address the elevator outage at the West Deck on the Marietta Campus (aka P60 Deck). We are in the process of obtaining the necessary parts to conduct repairs. Updates on our progress will be provided as the repairs continue.
Impact: Elevator #2 is currently out of order. The other elevator in the parking deck is in service.

Apr 26, 2025 17:06 - May 24, 2025 17:06 EDT
Update - TU demolition will begin on the 3rd floor and the main air handler for the floor will be turned off and will be turned on by July 10.
Jun 30, 2025 - 08:08 EDT
Update - Terminal Unit (TU) replacement began today with floor protection and ceiling removal on the 5th floor, progressing downward through the building.
Jun 23, 2025 - 13:49 EDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 23, 2025 - 07:00 EDT
Scheduled - We will be performing major scheduled utility maintenance at 402 Social Sciences starting on June 23 through August 7.
Impact: This project involves replacing the Terminal Units and the Energy Recovery Unit for the building. The project will be taking place at the Social Sciences building, but other surrounding areas including Bartow Avenue and the Visual Arts Loading Dock areas will be impacted.
On June 23, the Terminal Unit replacement will begin with floor protection and ceiling removal on the fifth floor, progressing downward through the building.
From June 30 through August 7, TU demolition will be taking place on a different floor each week. During this time, the main air handler for the floor will be turned off.
From July 7-9, Bartow Avenue will be closed due to the crane and other equipment that will be used to install the new Energy Recovery Unit. On July 8-9, the 4th and 5th floors will need to be vacated.

Jun 23, 2025 07:00 - Aug 10, 2025 07:00 EDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 06, 2025 - 07:00 EDT
Scheduled - We will be performing scheduled maintenance on the glass elevator (services from the 1st floor atrium/dining area to the 2nd floor lobby) at the Wilson Student Center starting on Friday, June 6 to Friday, August 15.
During this time, the glass elevator will be completely offline. Alternatively, patrons can use the elevator located towards the North entrance (next to the spiral staircase).

Jun 6, 2025 07:00 - Aug 15, 2025 07:00 EDT
Update - Scheduled maintenance is still in progress. We will provide updates as necessary.
May 13, 2025 - 13:48 EDT
Update - Scheduled maintenance is still in progress. We will provide updates as necessary.
Apr 26, 2025 - 17:13 EDT
Update - There is work that will be done this Saturday, 4/19 that will involve a large crane. Work is scheduled for 7:00 AM-3:00 PM. Both the 3rd and 4th floors will be primarily impacted by the project along with the loading dock areas for Burruss Building and the Commons. It is essential that those areas remain unoccupied during this timeframe. No utilities will be affected.
Apr 17, 2025 - 07:14 EDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Apr 07, 2025 - 10:00 EDT
Scheduled - Boiler Plant Project begins today, Monday, April 7 and will be completed by mid-July. This will involve demolition of the existing boiler system, construction to the surrounding area on the roof, and installation of new equipment. The heating component of the HVAC system will be non-operational starting today and will remain so throughout the month of April. The HVAC air conditioning system and the hot water heating system in the building will remain unaffected.
Apr 7, 2025 10:00 - Jul 10, 2025 10:00 EDT
Academic & Research Services ? Operational
IT/AV Checkout ? Operational
D2L Brightspace ? Operational
eCore ? Operational
High Performance Computing ? Operational
iThenticate ? Operational
Kaltura MediaSpace ? Operational
Moodle ? Operational
OwlTrain / Percipio ? Operational
Qualtrics ? Operational
Respondus ? Operational
Turnitin ? Operational
Virtual Owl ? Operational
VoiceThread ? Operational
CCSE Student Virtual Desktops Operational
Accounts & Identity Management ? Operational
NetID Services ? Operational
Multifactor Authentication - Duo ? Operational
Authentication Services Operational
Business Operations ? Partial Outage
Agiloft ? Operational
AiM Facilities Management ? Operational
apps.kennesaw.edu ? Operational
Campus Directory ? Operational
Concur ? Operational
DocuSign ? Operational
Door Access - KissFlow ? Operational
ePro / Peoplesoft ? Operational
ETQ Reliance ? Operational
Event Management System (EMS) ? Operational
Faculty Information System (FIS) ? Operational
Financial Edge ? Operational
Formstack ? Operational
GeorgiaFIRST Marketplace ? Operational
Grubhub Operational
Handshake - Student Hiring ? Operational
KCash Manager ? Operational
KSU Connect ? Operational
KSU Facilities Portal Operational
KSU Mall (Marketplace) ? Partial Outage
LiquidFiles (Send-A-File) Operational
Meal Plans ? Operational
Mobile Talon Card ? Operational
OmniUpdate ? Operational
OneUSG Connect ? Operational
Online Giving Website ? Operational
Owl Pay ? Operational
Parking Portal ? Operational
Point of Sale Systems ? Operational
Raiser's Edge ? Operational
Salesforce/TargetX Operational
SAS Reports ? Operational
ServiceNow ? Operational
Steppingblocks ? Operational
Student Recreation Center Portal ? Operational
Time Clocks Operational
Titanium Operational
WebCheckout Operational
Communications ? Operational
Campus Telephone System ? Operational
KSU Websites ? Operational
Microsoft 365 / Campus Email ? Operational
Microsoft Teams ? Operational
Network - Kennesaw ? Operational
Network - Marietta ? Operational
OwlTV ? Operational
PeachNet Network ? Operational
Student Housing Network (MyResNet) Operational
WiFi - Eduroam ? Operational
WiFi - Kennesaw ? Operational
WiFi - Marietta ? Operational
University Event Calendar - Localist ? Operational
Zoom Meetings Operational
KSUTV Operational
Productivity Services ? Operational
Adobe Creative Cloud ? Operational
Copy Print ? Operational
Scanning ? Operational
Global Protect VPN ? Operational
Shared Network Drives ? Operational
Student Records ? Operational
Banner Admin Pages Operational
Banner / Owl Express ? Operational
CampusLogic ? Operational
DataTransfer ? Operational
Decisions ? Operational
DegreeWorks ? Operational
ePay / Student Accounts ? Operational
Housing Portal - StarRez ? Operational
iStart/Sunapsis Operational
Navigate EAB ? Operational
OnBase ? Operational
OwlLife ? Operational
Scholarship Portal ? Operational
Symplicity ? Operational
Watermark ? Operational
Utilities & Engineering Services Kennesaw Under Maintenance
HVAC(Heating, Ventilation, and Air Conditioning) Systems Under Maintenance
Campus Water System Operational
Campus Electrical System Operational
Campus Roads and Parking Lots Operational
Campus Gas System Operational
Utilities & Engineering Services Marietta Under Maintenance
HVAC(Heating, Ventilation, and Air Conditioning) Systems Operational
Campus Water System Operational
Campus Electrical System Under Maintenance
Campus Roads and Parking Lots Operational
Campus Gas System Operational
Operational
Degraded Performance
Partial Outage
Major Outage
Maintenance

Scheduled Maintenance

iStart/Sunapsis Planned Maintenance, Wednesday, 07/02/2025, 5:00 P.M. through Wednesday, 07/02/2025, 8:30 P.M. Jul 2, 2025 17:00-20:30 EDT

iStart/Sunapsis will be unavailable for system maintenance beginning Wednesday, 07/02/2025, 5:00 P.M. and extending through Wednesday, 07/02/2025, 8:30 P.M.

Have questions? Call 470-578-6999 or email service@kennesaw.edu

Posted on Jun 23, 2025 - 19:40 EDT

iStart/Sunapsis Planned Maintenance, Wednesday, 07/09/2025, 5:00 P.M. through Wednesday, 07/09/2025, 8:30 P.M. Jul 9, 2025 17:00-20:30 EDT

iStart/Sunapsis will be unavailable for system maintenance beginning Wednesday, 07/09/2025, 5:00 P.M. and extending through Wednesday, 07/09/2025, 8:30 P.M.

Have questions? Call 470-578-6999 or email service@kennesaw.edu

Posted on Jun 23, 2025 - 19:41 EDT

iStart/Sunapsis Planned Maintenance, Wednesday, 07/16/2025, 5:00 P.M. through Wednesday, 07/16/2025, 8:30 P.M. Jul 16, 2025 19:41-23:11 EDT

iStart/Sunapsis will be unavailable for system maintenance beginning Wednesday, 07/16/2025, 5:00 P.M. and extending through Wednesday, 07/16/2025, 8:30 P.M.

Have questions? Call 470-578-6999 or email service@kennesaw.edu

Posted on Jun 23, 2025 - 19:42 EDT

iStart/Sunapsis Planned Maintenance, Wednesday, 07/23/2025, 5:00 P.M. through Wednesday, 07/23/2025, 8:30 P.M. Jul 23, 2025 17:00-20:30 EDT

iStart/Sunapsis will be unavailable for system maintenance beginning Wednesday, 07/23/2025, 5:00 P.M. and extending through Wednesday, 07/23/2025, 8:30 P.M.

Have questions? Call 470-578-6999 or email service@kennesaw.edu

Posted on Jun 23, 2025 - 19:43 EDT
Jul 2, 2025

No incidents reported today.

Jul 1, 2025
Resolved - This incident has been resolved.
Jul 1, 09:17 EDT
Investigating - Some users are currently reporting issues with the Banner Admin Pages. We are currently investigating these issues.

We know the Banner System is important to you, and the IT team is working quickly to fix it.

Have questions? Call 470-578-6999 or email service@kennesaw.edu

Jul 1, 09:13 EDT
Completed - The scheduled maintenance has been completed.
Jul 1, 01:00 EDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 30, 17:30 EDT
Scheduled - Banner (Production Database, Owl Express, Banner Administrative Pages, and Degree Works) will be unavailable for system maintenance beginning Monday, 6/30/2025, 5:30 p.m. and extending through Tuesday, 7/01/2025, 1:00 a.m.

For questions or assistance, please contact the KSU Service Desk at service@kennesaw.edu or 470-578-6999.

Jun 5, 10:46 EDT
Jun 30, 2025
Completed - The scheduled maintenance has been completed.
Jun 30, 19:00 EDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 27, 17:00 EDT
Scheduled - The KSU Bookstore website will experience intermittent outages during system maintenance beginning Friday, 06/27/25, 5:00 p.m. and extending through Monday, 06/30/25, 7:00 p.m.

Have questions? Call 470-578-6999 or email service@kennesaw.edu

Jun 27, 16:55 EDT
Jun 29, 2025

No incidents reported.

Jun 28, 2025

No incidents reported.

Jun 27, 2025
Jun 26, 2025
Completed - We are pleased to confirm that the sewer repair work outside of Hornet Village on the Marietta Campus has been completed. The new sidewalk is open for pedestrian use; however, vehicle access should be restricted until after July 21st to allow the concrete to properly cure for 30 days.
Jun 26, 10:28 EDT
Update - Timeline for the project has been extended due to recent weather conditions. Work is estimated to conclude by next Friday, June 27.
Jun 17, 07:56 EDT
In progress - Work has been rescheduled to begin Monday, June 9.
Jun 9, 06:00 EDT
Scheduled - A sewer line replacement is in progress between two manholes located in front of Hornet Village, extending from Building 100 to the entrance of Building 200.
Work will begin on Thursday, June 5 and is expected to conclude on Sunday, June 15.
The sidewalk along the K-Field side of Hornet Village will not be accessible. Alternatively, pedestrians may use the pathway adjacent to the West Residence Lot or the sidewalk connecting Lot G to Alumni Walk.

Jun 2, 14:49 EDT
Completed - Maintenance at Prillaman Hall for Elevator #1 has been successfully completed. Services are now fully operational.
Jun 26, 08:53 EDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 23, 08:06 EDT
Scheduled - Our team addressing the elevator outage at Prillaman Hall on the Kennesaw. Our contractor has been notified and will be on site to observe and start on repairs as soon as possible. Updates on our progress will be provided as the repairs continue.
Impact: Elevator #1 is currently out of order. Elevator #2 is still in service.

Jun 23, 08:06 EDT
Jun 25, 2025
Completed - The scheduled maintenance has been completed.
Jun 25, 20:30 EDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 25, 17:00 EDT
Scheduled - iStart/Sunapsis will be unavailable for system maintenance beginning Wednesday, 06/25/2025, 5:00 P.M. and extending through Wednesday, 06/25/2025, 8:30 P.M.

Have questions? Call 470-578-6999 or email service@kennesaw.edu

Jun 23, 19:34 EDT
Jun 24, 2025

No incidents reported.

Jun 23, 2025
Completed - The scheduled maintenance has been completed.
Jun 23, 09:05 EDT
Update - Due to recent weather conditions, the project timeline was extended. Work is estimated to be completed by Wednesday, June 18, weather permitting.
Jun 17, 07:58 EDT
Update - Scheduled maintenance is still in progress. We will provide updates as necessary.
Jun 10, 12:57 EDT
Update - Scheduled maintenance is still in progress. We will provide updates as necessary.
Jun 3, 07:58 EDT
Update - Scheduled maintenance is still in progress. We will provide updates as necessary.
May 30, 09:04 EDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
May 26, 06:00 EDT
Scheduled - We will be performing scheduled maintenance outside of Kennesaw Hall starting on Monday, 5/26.
A contractor will be performing construction work on the concrete and paver surfaces surrounding the 'Tea House' (gazebo) area. We do not anticipate any disruption to the pathway from the Convocation Center to Kennesaw Hall. However, due to ongoing construction activities involving noise, dust, and debris, we recommend that patrons use alternative entrances to Kennesaw Hall, such as the rotunda area near the Registrar's Office or the Northwest entrance near the Bagwell Building.

May 23, 07:05 EDT
Jun 22, 2025

No incidents reported.

Jun 21, 2025
Completed - The scheduled maintenance has been completed.
Jun 21, 12:00 EDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 21, 08:00 EDT
Scheduled - VoiceThread will remain available, but users may experience slowness during system maintenance beginning Saturday, 06/21/2025, 8:00 a.m. and extending through Saturday, 06/21/2025, 12:00 p.m.

For questions or assistance, please contact the KSU Service Desk at service@kennesaw.edu or 470-578-6999.

Jun 20, 10:16 EDT
Jun 20, 2025
Completed - We are pleased to confirm that the electrical maintenance in Kennesaw Hall has been completed. The system has been tested, and the power is now fully operational. The HVAC system has been reactivated; please be advised that it may take some time for the building to reach the desired temperature.
Jun 20, 14:47 EDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 19, 05:00 EDT
Scheduled - We will be performing scheduled electrical maintenance at Kennesaw Hall starting at 5AM on Thursday, June 19-Saturday, 21.
Impact: The switchgear on the electrical power system in Kennesaw Hall will be replaced and the power will be off throughout this time, except for equipment operating on emergency power. Internet access will be unavailable during this time. If individuals forward their phone numbers prior to the outage, call forwarding and voicemail functions will remain active. However, if numbers are not forwarded in advance, only voicemail will be available during the downtime.

Jun 11, 14:12 EDT
Jun 19, 2025
Completed - The scheduled maintenance has been completed.
Jun 19, 06:00 EDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 19, 05:01 EDT
Scheduled - Access to the campus network will be temporarily unavailable in the Sturgis Library, L building and M building during a system upgrade on Thursday, 6/19/2025, 5:00 a.m. and extending through Thursday, 6/19/2025, 6:00 a.m.

For questions or assistance, please contact the KSU Service Desk at service@kennesaw.edu or 470-578-6999.

Jun 5, 11:07 EDT
Jun 18, 2025
Resolved - The utility outage affecting the Science Lab Building 3rd floor outlets has been resolved as of 12:30pm.
Jun 18, 12:30 EDT
Identified - Our team is addressing an insolated power outage at the Science Lab Building. A breaker tripped affecting the power outlets only on the third floor of the Science Lab building. Repairs are underway and are anticipated to take approximately one hour.
Jun 18, 10:32 EDT
Completed - The scheduled maintenance has been completed.
Jun 18, 06:00 EDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 18, 05:00 EDT
Scheduled - Access to the campus network will be temporarily unavailable in the Convocation and English buildings during a system upgrade on Tuesday, 6/17/2025, 5:00 a.m. and extending through Tuesday, 6/17/2025, 6:00 a.m.

For questions or assistance, please contact the KSU Service Desk at service@kennesaw.edu or 470-578-6999.

Jun 5, 10:56 EDT