Electrical and HVAC Impacts for 640 Architecture

Scheduled Maintenance Report for Kennesaw State University

Completed

The scheduled maintenance has been completed.
Posted May 22, 2026 - 13:00 EDT

In progress

Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted May 21, 2026 - 05:00 EDT

Scheduled

Impact Details:
Description & Location:  Next week, scheduled work on the building’s electrical systems and chiller equipment will result in temporary disruptions affecting life‑safety systems, door access, elevator service, and building air conditioning. These impacts will affect the entire Architecture Building.
Schedule:
-Thursday, May 21 – The emergency panel shutdown will begin at 5:00 AM and conclude at approximately 1:00 PM.
-Friday, May 22 – The main panel shutdown for pumps and chiller equipment will begin at 5:00 AM and conclude at approximately 1:00 PM.
Reason:  This work is required to complete electrical system repairs and upgrades to the emergency panel and chiller pump controls.
Logistics:
-May 21: Door access will be offline. Emergency lighting and the elevator will be out of service. Fire alarms and the data center will be placed on backup power while work is underway.
-May 22:
The main panel supporting chiller pumps and the air conditioning system will be shut down.
Posted May 20, 2026 - 07:42 EDT
This scheduled maintenance affected: Utilities & Engineering Services Marietta (HVAC(Heating, Ventilation, and Air Conditioning) Systems, Campus Electrical System).