About KSU Services Status Page

The Kennesaw State University Services Status page provides real-time updates on the operational status and maintenance of essential KSU services, including Information Technology and Utilities and Engineering.

Use the link below to sign up for text or email updates.

Planned Water Outage for 846 Crawford Lab Building on 9/18

Scheduled Maintenance Report for Kennesaw State University

Completed

The scheduled maintenance has been completed.
Posted Sep 18, 2026 - 08:00 EDT

In progress

Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Sep 18, 2026 - 06:00 EDT

Scheduled

New Information: 
The work was originally scheduled for this morning but has been postponed. It is now rescheduled for Friday, September 18, from 6:00 to 8:00 a.m.

Impact Details
Description & Location: Water service will be turned off throughout the building to facilitate the installation of isolation valves in the main water line.

Reason: This outage is necessary to complete valve installation work that will support future maintenance and improve system reliability.

Logistics: All floors of the building will be without water during the outage period. Restrooms, sinks, eyewash stations, and any equipment requiring water will be unavailable. Occupants should plan accordingly and use restrooms in nearby buildings during this time (e.g. Engineering Lab, Engineering Technology Center,
Mathematics Building, Academic Building).

Please feel free to reach out with any questions or specific constraints we should keep in mind at plantops@kennesaw.edu or call 470-578-6224.
Posted Sep 03, 2026 - 09:35 EDT
This scheduled maintenance affected: Utilities & Engineering Services Marietta (Campus Water System).